Major Project

S.N. Project Name Name & Designation of Project Director Location Total Area Approval Stage Activities Project Period Date of Commencement Completion date of Project Main Objective Download
1 Feasibility study for extension of existing underground mining operation of Barapukuria Coal Mine towards the southern and the northern side of the basin without interruption of the present production (1st Revised). A.B.M Kamruzzaman, General Manager (Planning & Exploration) & Project Director (Feasibility study for extension of existing underground mining operation of Barapukuria Coal Mine towards the southern and the northern side of the basin without interruption of the present production (1st Revised)) Southern and Northern side of the presently coal producing central part of Barapukuria Coal basin, Parbatipur, Dinajpur. 4.5 Square kilo-meter. Approved by Energy and Mineral Resource Division (EMRD) on 31-01-2017. Contract Agreement has been completed with 1st Rank Consulting Firm JOHN T. BOYD COMPANY, USA & Mazumder Enterprise, Bangladesh. Physical works has been started at 02-03-2017. 18 months (Physical works). 02 March 2017 01 September 2018 Extension of the Mining activities in the Southern and Northern side of the presently coal producing central part of the Barapukuria Coal Basin. Download
2 Feasibility Study for Development of Dighipara Coal Field at Dighipara, Dinajpur,Bangladesh-Project.” Khan Md. Zafor Sadiq, Dy. General Manager (Marketing & Sales), BCMCL, Dinajpur & Project Director (Feasibility Study of Dighipara Project) Nowabgonj, Hakimpur,& Birampur Upazila, Dinajpur. 24 Square kilo-meter. Approved by Energy and Mineral Resource Division (EMRD) on 02-02-2017 Contract Agreement has been signed with a consortium of MIBRAG CONSULTING INTERNATIONAL GmbH, Germany, FUGRO CONSULT GmbH, Germany & RUNGE PINCOCK M INARCO LIMITED,Australia dated on 30 May 2017. Phyical works has been started on 01-06-2017. 30 months 01 January 2017 31st March 2019 Identify the total reserve of Dighipara coal basin (within 24 square kilo-meter) and to develop a coal mine of 3 million ton production capacity/year in the central part of basin (within 6 square kilo-meter). Download